Spraying in Your Area
Refurbish cladding, frames, roofs, ceilings, steel, and floors with professional On-Site Spraying, Coatings, Refurbishment. Clean sites, fast programmes, colour matching, and long-life systems across UK & Ireland.
On-Site Spraying, Coatings, Refurbishment delivered in Your Area
From survey and spec through to QA and warranty.
Cladding Spraying
Metal & plastisol panels, doors, trims, and flashings — colour refresh or full rebrand.
Curtain Wall & Frames
Aluminium windows, mullions, doors, and shopfronts with a smooth factory look on site.
Roof Coatings
Liquid waterproofing for metal and asbestos cement. Stop leaks and extend life.
Intumescent to Steel
30/60/90-minute ratings with full QA records for load-bearing members.
Epoxy & PU Floors
Hard-wearing, chemical-resistant floors for warehouses and production areas.
On-Site Spraying
Ceilings, soffits, steelwork, plant, ducts, and blockwork — tidy masking and fast turnarounds.
Refurbish, don’t replace
Recoat instead of swapping panels and frames. Lower cost, quicker delivery, less disruption in Your Area.
- Manufacturer-approved systems
- Colour stability and gloss retention
- Warranty backed options
Live-site programmes
Night and weekend shifts to keep sites trading across UK & Ireland, with safe containment and neat masking.
- RAMS and inductions
- Dust and overspray control
- Daily updates
Quality paperwork
DFT/WFT checks, cure monitoring, and photo records for a smooth sign-off.
- Adhesion tests where needed
- Product data sheets
- Warranty documents
How projects run in Your Area
Clear stages, clean finish.
1) Survey & Spec
Substrate checks, moisture readings, and a written spec with colours and DFT targets.
2) Prep & Protection
Abrasive prep, degrease, corrosion treatment, and full masking/containment.
3) Application & QA
Airless/HVLP to spec with WFT/DFT checks, cure monitoring, and photo logs.
4) Handover & Warranty
Snag-free finish, maintenance notes, and warranty pack.
Recent results
Examples from UK & Ireland
- 5000 m² distribution centre — cladding colour change, night shifts only.
- Retail park frames — full rebrand across three units.
- Asbestos cement roof — leak stop and warranty system.
Spraying vs replace
What you gain by recoating
| Factor | Spraying | Replacement |
|---|---|---|
| Programme | Days/weeks on a live site | Weeks/months and shutdowns |
| Cost | Lower project cost | Higher capex + waste |
| Disruption | Night/weekend options | Significant disruption |
| Look | Factory-smooth finish in situ | New material look |
| Sustainability | Less waste, fewer deliveries | Removal and disposal |
Typical inclusions
- Survey & specification
- Prep & masking
- Airless/HVLP application
- QA checks and records
- Warranty documents
Variables that affect price
- Access & height
- Existing condition
- System and colour
- Programme hours
- Area in m²
Speed up your quote
- Photos or drawings
- Surface areas
- Preferred colours
- Target dates
- Site address in Your Area
Spraying FAQs — Your Area
Key points for planning
How long does the finish last?
Can you work around operations?
Do you colour match?
What paperwork do we receive?
Need pricing for Spraying in Your Area?
Send details for a same-day response.